The StreamCalculationPeriodDateGrp is a repeating subcomponent of the StreamCalculationPeriodDates component used to detail fixed dates for the swap stream.
Added in protocol FIX.5.0SP2 (EP 169)
Field or Component | Name | Description | Is Required | Added | Is Deprecated |
---|---|---|---|---|---|
41241 | NoStreamCalculationPeriodDates | FIX.5.0SP2 (EP 169) | |||
41242 | StreamCalculationPeriodDate | Required if NoStreamCalculationPeriodDates (41241) > 0. | FIX.5.0SP2 (EP 169) | ||
41243 | StreamCalculationPeriodDateType | When specified it applies not only to the current date but to all subsequent dates in the group until overridden with a new type. | FIX.5.0SP2 (EP 169) |